Red Oak – Oglesby Road Campus

367 Oglesby Road, Red Oak, Texas in Ellis County

Updated On November 2, 2026

Where It Stands

Most of this land is already zoned for data center use; we’ve chosen to rezone so we can build further setbacks, berms and landscaping into the plan — screening the campus from the road and putting more distance between our buildings and the nearest homes. 

On Thursday, November 5, from 5 to 8 p.m., Compass will host a community open house at the Red Oak Municipal Center, 200 Lakeview Parkway, Red Oak, TX 75154. Residents are welcome to stop by, meet our team, and ask questions about our development in Red Oak. 

There’s no formal presentation, so you won’t miss anything by arriving late or leaving early — stop by whenever your schedule allows and stay as long as you’d like. 

Light bites will be provided, and a Kid Zone with activities means parents can bring the kids and still have time to ask questions. 

What We’re Proposing Here:

A 10-building, 400 MW campus served by a dedicated on-site substation, fully funded by Compass, plus a planned switching station near the existing 138 kV transmission line, built in partnership with Oncor.

Campus Information

Located at 367 Oglesby Road, Red Oak, Texas in Ellis County.
Board image
Board image
Board image
Board image
Board image
Board image
DFW-A-Open-House-Boards
Board image
Board image
Board image

What Is A Data Center?

A data center is a secure building full of servers, and it is one of the most essential pieces of infrastructure in modern life. Your bank balance lives in one, and so do your medical records, your paycheck, your prescriptions, kid’s schoolwork, every text you send and every card you swipe. Most people use data centers hundreds of times a day without realizing it. 

Learn More

Who We Are

Compass Datacenters does data centers differently. As a Class A, Community-First developer, we hold every project to the highest standards – shaped by more than 15 years of experience, 20 campuses and close partnerships where we build.

Class A, Community-First Developer
Board image
Board image
Board image
Board image
Board image
Board image
DFW A Open House Boards_Page_07
Board image
Sound Board
Board image
Board image
Board image
Board image
Board image
Board image
Board image
Economic Impact of Red Oak
Board image
Board image
Board image
Board image
Board image

Our Commitments

Data centers shouldn’t use your water. We agree. 

Since our founding in 2011, Compass has used zero city water for cooling. Our air cooling and closed-loop systems recycle the same water indefinitely. There is no evaporative cooling and no draw from your reservoirs or aquifers. To put that into perspective, each Compass data center uses roughly the same amount of water annually as two average households. 

Raising The Bar

Red Oak Community Q&A

Zoning, Scale & Campus Master Plan

The original number of data centers for this site was 10 in phase 1. How many are included in the new PD-194 concept plan that will be shown at the November 17 joint P&Z/City Council meeting?

The concept plan includes 10 buildings on approximately 400 acres west of Oglesby Road, an 867-acre site. More than half of the site will remain undeveloped, including a 100-acre public park with hike and bike trails along Brushy Creek. The site plan, cross sections and landscape renderings are available at our project page: Red Oak – Oglesby Road Campus – Compass Datacenters

What is the MAXIMUM number of data centers that this site plans to build out to in subsequent phases?

Ten buildings is the maximum. That ceiling is set in the concept plan. Nothing beyond it can be built without returning to the City for a new approval.

What is the breakdown of all civil infrastructure and road work planned for Goodloe Lane, including the specific impacts on local rights-of-way, easements, and residential borders?

Goodloe Lane: No residential access should be affected. The plan shows the site entry and emergency access drive from FM 2377, not from Goodloe Lane. The Goodloe Lane boundary is screened with a 4-foot earthen berm topped with 8-foot shrubs, behind an 8-foot security fence, with shrubs and trees extending along the full western border.

With our project, Goodloe Lane will be converted from a one-lane road to a two-lane undivided road within the same right-of-way. All road improvements will be paid for by Compass. The City’s Master Thoroughfare Plan contemplates extending Goodloe Lane to the north to connect with Pierce Road (as shown on the Concept Plan); if that decision is made by the City, Compass will grant the necessary right-of-way to the City.

What is Compass’s decommissioning plan for the site?

The campuses we build are 100-year assets. We own and operate every campus we build rather than selling them. The buildings are designed so equipment can be replaced as technology changes, without rebuilding.

Compass has been part of Red Oak since 2019 and has invested more than $72 million in grid infrastructure at this site alone. If decommissioning were ever required, we would comply with all federal, state and local requirements.

What are the plans for the section of the site between Oglesby Road and Pratt Road?

During early site work, this area will be used for construction staging, parking and laydown – set back 500 feet from neighboring homes, as the ordinance requires, so construction traffic stays inside the site and off neighborhood roads. When construction is complete, those temporary facilities come out, leaving open space. What happens next – parks, sports fields or neighborhood businesses – will be up to the City and the community.

What is the estimated timeline for construction start and for the campus to come fully online?

If PD-194 is approved and ERCOT allocates power, the design and permitting process typically takes 12 to 18 months before site preparation begins. Construction of the full campus will occur in phases, with each building brought online as it is completed and commissioned.

Will road improvements on Goodloe Lane and Oglesby Road be completed before construction begins, or will they occur concurrently with site prep?

Road improvements are designed to be sequenced so they are substantially complete before heavy construction traffic uses those routes.

In what order will the data center buildings be constructed – north to south, east to west?

We won’t know until the civil engineering is complete. The specific building sequence will be detailed in the construction plan which will come later in the project lifecycle.

Does Compass have a fixed design plan for all 10 buildings, or might you change designs before all construction is completed?

All buildings will follow our prototypical design as they have in Red Oak already. Any change to those conditions requires returning to the City for a PD modification, which means a public process. Architectural details such as building materials and facade treatment may be refined through construction documents, but nothing that changes a PD condition can happen without city and public review.

Acoustic Metrics & Operational Noise Mitigation

What are the baseline dBA and dBZ metrics recorded at the western property perimeter before construction, and what is the projected cumulative noise level after the campus becomes fully built out?

During normal operations, the study projects our campus will operate at or below 55 dBA, the EPA and World Health Organization’s residential guideline.

The residential guideline set by EPA and the World Health Organization is based on dBA, not dBZ.

Will the fully built-out campus be able to meet the “Not to exceed 70 dBA OR 70 dBZ” noise limit in the current Red Oak ordinance 26-014, or will a different noise limit be proposed for PD-194?

The ordinance sets a limit of 60 dBA at the property line under normal operating conditions, measured as an average over time, which is down from 70 dBA in May. Consistent with the EPA’s approach to community noise, that limit is measured on a scale that reflects what people actually hear. The ordinance also includes a 70 dBC limit, which addresses low-frequency sound that residents have raised. That replaces the dBZ measure, which counts sound people can’t hear and is easily distorted by wind and traffic.

During normal operations, our campus is designed to the World Health Organization’s community noise guideline of 55 dBA at the property line, which gives us a margin below the limit. If a neighbor has a concern, we will look into it and address it.

What specific physical barriers, acoustic blankets, or structural enclosures are being integrated into the design of this site to block low-frequency (dBC) noise from impacting neighbors?

Our design manages noise from all campus operations, including low-frequency sources such as HVAC fans and transformers, through a combination of physical mitigation build into the site:

Distance: Buildings on the west side are set back 200 feet from the property line, placing the nearest homes 403 feet from the equipment yard – longer than a football field including both end zones, which measures 360 feet.

Acoustic enclosures: Our backup emergency generators are housed in an acoustic enclosure as part of our standard design.

Berms and screening: A 4-foot earthen berm with landscaping runs along the western and northern property boundaries.

During normal operations, noise is managed at or below 55 dBA at the property line – the EPA and World Health Organization residential guideline.

On what scientific or public health basis does a “Class A, Community First” developer justify utilizing the 70 dBZ proposed noise limits immediately adjacent to a residential neighborhood?

dBZ is a radar reflectivity unit used in weather measurement and is not a recognized metric for evaluating community sound impact. The EPA and World Health Organization’s measure for residential noise is dBA, which weights sound frequencies the way human hearing perceives them.

During normal operations, our campus is designed to run at or below 55 dBA at the property line, the level the World Health Organization and the EPA identify as appropriate for residential areas.

Public information requests reveal that Compass has provided the City of Red Oak with no acoustic modeling or compliance testing on the Houston School Road site. What will be different with this new site?

Compass conducts acoustics studies for all projects, including this one.

Will Compass commit to installing permanent, publicly accessible, third-party monitored decibel meters on the western fence line to ensure real-time compliance?

During normal operations, our project is designed to fall within all required EPA and World Health Organization noise guidelines. If the community feels at any time that we are not in compliance, we will work with the city to confirm or deny and make any adjustments required.

Backup generator testing will cause severe noise spikes right at our property lines. What enforceable restrictions are being put on this campus to ensure these testing cycles do not disrupt the neighboring residences

Backup emergency generator testing is conducted during daytime hours only and in compliance with all TCEQ and EPA standards.

Will Compass proactively monitor noise and address issues without waiting for neighbors to complain?

Compass will do a noise study after construction is completed to confirm and compare sound levels with pre-construction modeling, and we will make any adjustments required to stay within EPA and World Health Organization limits.

During normal operations, our campus is designed to run at or below 55 dBA at the property line, the level the World Health Organization and the EPA identify as appropriate for residential areas.

How will the facility ensure that low-frequency vibrations from normal operations do not penetrate nearby homes?

Vibration-generating equipment is mounted on isolation systems that absorb mechanical energy before it reaches the building structure or ground. Vibration from normal operations is not expected to be perceptible at the property line.

Will all generators be tested at the same time? And will residents receive advance notice before generator testing begins?

Emergency backup generators across the campus will not be tested simultaneously. Testing is staggered across buildings to limit the cumulative noise from any single testing period – all in compliance with TCEQ and EPA standards.

Setbacks, Footprints & Visual Buffers

Does Compass consider a tight 135-foot setback to be an actual “Class A, Community First” best practice, or is it simply the absolute minimum layout you could squeeze onto this acreage to maximize server footprint?

Compass agreed to a 135-foot setback set by the City in May – nearly four times the standard industrial requirement – and Compass has extended that to 200 feet on the western side adjacent to Goodloe Lane and to 150 feet on other sides. When you add the right-of-way and residential setbacks, the actual distance from our equipment yard to the nearest home is
403 feet – longer than a football field including both end zones, which measures 360 feet.

What is the exact physical setback distance (in feet) being proposed for this campus?

When you add the right-of-way and residential setbacks, the actual distance from our equipment yard to the nearest home is 403 feet – longer than a football field including both end zones, which measures 360 feet.

How will the visual profile of this facility contrast with your Tater Brown Road site when viewed from properties on Goodloe Lane, and what specific architectural modifications will be made to prevent this campus from dominating the visual line of sight?

From Goodloe Lane, the view is a berm-elevated continuous tree line with buildings largely screened behind it. We designed this campus with the viewshed in mind: a 4-foot berm topped with 8-foot shrubs runs the full length of the western border, and a 200-foot setback before the nearest building. The site is also graded down, so buildings sit lower than road level, further reducing what neighbors see from the street.

Will Compass commit to solid, sound-dampening masonry walls and mature evergreen landscaping along the property lines bordering our homes, instead of Ameristar fencing and minimal vegetation?

The design already includes the elements that move the needle on sound: a 4-foot berm topped with 8-foot shrubs along the full western border, generators housed in acoustic enclosures, and a 200-foot setback from the property line. Together, these bring the campus to at or below 55 dBA at the property line during normal operations – the World Health Organization’s and EPA’s residential guideline.

Will Compass commit to replacing ALL mature trees that will be demolished during construction and plant fast-growing native trees as replacements?

More than half of the 867-acre site will remain undeveloped, and we are dedicating 100 acres to public parkland, including hike and bike trails along Brushy Creek, which we will also clean up. Scores of trees across the property will be preserved as part of that commitment.

Where construction requires tree removal, we will replace them with native North Texas species, prioritizing fast-establishing varieties. Additional trees will be planted along the perimeter to improve the viewshed for neighboring properties.

How will Compass ensure that lighting around the facility does not penetrate toward residences bordering the complex?

All exterior lighting will be full-cutoff, downward-facing fixtures aimed inward toward the site. Pole heights and fixture specifications will be selected to prevent off-site light trespass.

Will the 4-foot berms be measured from existing grade or from the new, raised road grade? Is 4 feet adequate screening from the new road level?

The 4-foot berms along the north and west property edges are designed to provide visual and noise screening in combination with landscaping. Berm height relative to Goodloe Lane’s finished road elevation will be determined in final site engineering.

Mark Halford received a written list of requests from Goodloe Lane residents at the open house, requesting enhanced setbacks, acoustic fencing, taller berms, and dense green space. What is being done with those requests?

Since May we have met with Red Oak residents, held an open house and worked through a long list of written questions from neighbors. What we heard reinforced commitments we were already making as a Class A developer – and in some cases we have gone farther.

More than half of the 867-acre site will remain undeveloped, and we are dedicating 100 acres to public parkland, including hike and bike trails along Brushy Creek, which we will also clean up. Scores of trees across the property will be preserved as part of that commitment.

We also extended the setback to 200 feet on the western side and 150 feet on every other boundary. The substation, which previously required no setback, now sits at least 150 feet from the property line. Four-foot berms with landscaping run along the north and west edges. We eliminated campus access from Goodloe Lane. We restricted emergency backup generator testing to weekday business hours. Our commitments are enforceable conditions in the ordinance.

Is Compass willing to meet dark sky lighting standards to prevent rooftop equipment and tall poles from creating a glow visible from residential windows?

Our full-cutoff fixture requirement prevents light from escaping horizontally or upward, which is the core requirement of dark sky standards. Between the lighting design and the berm/trees, we are implementing best-in-class light reduction.

Health, Environmental & Microclimate Impacts

Exactly how many hours consecutively will generators run for routine testing, and what specific volume of nitrogen oxides (NOx) and ultrafine particulate matter will neighboring residential properties be exposed to during active operation? 

Emergency backup generators are there for one reason: to keep the site running if utility power fails. They are not a power source and do not run to supply the campus. Our generators run on cleaner-burning biofuel rather than traditional diesel, where available. They are tested periodically, during daytime hours, and both the emissions and the sound were included in the air quality analysis and the acoustic modeling filed with the city to ensure compliance with World Health Organization, EPA and local guidelines.  

For independent, field-validated data on HVO emissions performance in data center generators, see the EPRI study: DCFlex Demonstration of Cleaner Backup Power: Field-Validated Emissions Performance of Hydrotreated Vegetable Oil (HVO) in Data Center Backup Generators 

During a prolonged grid failure requiring full-campus backup power, what safeguards will prevent residents from being forced to evacuate their homes during an extended emergency run? 

In more than 15 years of operating data centers, no Compass campus has ever caused the evacuation of a neighboring home. Our generators run on HVO biofuel, where available – a cleaner-burning renewable fuel – and are designed and permitted for extended operations. The air quality analysis for this campus confirms air quality would remain within safe limits even during a prolonged emergency run – both for our employees onsite and for our neighbors offsite.  

What is the projected localized increase in ambient temperature caused by the urban heat island effect, and how will Compass prevent this thermal plume from raising residential utility cooling costs? 

The “heat island” concern for hyperscale data centers has been disproven by peer-reviewed science. A November 2026 study in Environmental Research Letters, using 13 years of satellite data from the world’s largest hyperscale data center cluster, found that measurable warming beyond the property boundary is physically impossible. The campus simply does not produce enough heat to raise temperatures in the surrounding neighborhood. Daytime temperatures around the studied campuses actually decreased after the facilities came online.  

Our site reinforces this further: more than half of the 900.5-acre site will remain undeveloped, 100 acres will be dedicated public parkland, and our buildings use high-reflectivity roof membranes that absorb less heat than a conventional dark roof.  

Source: Jing (2026), Environmental Research Letters. Read the Study. 

What specific chemical additives will be used in the cooling towers on site, and what is the risk of wind-driven “drift” carrying aerosolized chemicals onto nearby residential properties? 

Our site does not use cooling towers and therefore no such drift can occur.  

Have independent, third-party environmental studies been conducted? If not, when will they be done, and will neighbors have access to the results? 

All required reports will be submitted with our project applications.

What impact will converting this farmland to impervious concrete and pavement have on drainage at neighboring properties, and can those drainage studies be made public? 

The concept plan addresses stormwater management through detention ponds sized for a 100-year storm event, culvert upgrades along FM 2377, and a stormwater pollution prevention plan filed with TCEQ before any grading begins. It is also worth noting that more than half of the 867-acre site will be undeveloped, including the 100-acre public park along Brushy Creek, which preserves natural drainage. 

These improvements are designed to perform better than the current conditions for neighboring properties.

Construction Phase & Residential Disruptions

Exactly which local roads are designated as the official ingress and egress routes for construction vehicles? 

The concept plan shows the site entry and emergency access drive from FM 2377 and Oglesby Road. Those routes will be specified in the traffic management plan submitted to the city.

How will Compass police its traffic management plan to guarantee that all heavy equipment and construction workers use designated routes rather than residential side roads like Goodloe? 

We plan to have an onsite batch plant to reduce concrete truck traffic to our site.  

The approved traffic management plan will be incorporated into our general contractor’s contract We will also provide the city with a direct reporting contact so that if a neighbor sees a construction vehicle on Goodloe or another prohibited road, they can reach someone with authority to act immediately.

With three Red Oak school entrances located right off FM 2377, what concrete actions will Compass take to ensure that heavy construction traffic does not back up school zones, delay buses, or create dangerous driving conditions? 

As part of the permitting process, Compass will submit a construction traffic plan to the city showing how heavy equipment will be routed to avoid school zones during morning arrivals and afternoon dismissals. Where feasible, we will use on-site batch plants to significantly reduce concrete truck traffic on public roads.  

Worker commutes are outside Compass’ control, but we will work with our general contractor to communicate preferred routes and roads to avoid during school hours, and we will raise the concern with the City so that any needed traffic management on public roads can be coordinated through the appropriate authority.  

What specific seismic or vibration-monitoring arrays will be installed along the western residential property lines during excavation, and what is the maximum peak particle velocity (PPV) threshold Compass will enforce to prevent structural damage to adjacent homes? 

We use vibration monitoring during excavation work near residential properties. Monitors are placed along the property line, readings are logged, and work is adjusted or paused if readings approach established thresholds.

What advanced, continuous particulate-matter tracking and chemical dust-suppression protocols will be deployed on-site beyond standard water trucks? 

Standard dust suppression on a site this size includes water trucks (using reclaimed, non-potable water), soil stabilizers on disturbed areas and wheel-wash stations at all site exits. Where possible, we use on-site concrete batch plants that reduce truck traffic and associated dust significantly.  

If dust levels exceed safe residential thresholds, does Compass have a mandatory stop-work trigger? 

We have air quality monitors onsite. If the air quality readings are above certain thresholds, we enact dust control measures.  

Ordinance 26-014 limits outdoor construction to 7am–7pm, but contractors frequently violate these rules. What remedies will Compass commit to if contractors do not follow agreed commitments? 

We comply with all laws and local regulations.

What concrete steps will be operational before civil grading begins to prevent sediment-heavy stormwater runoff and mud tracking onto public roadways? 

Before any grading begins: perimeter silt fencing and filter socks are installed along all drainage pathways, temporary retention basins are sized for a 100-year storm event (detention ponds are shown on the concept plan), and wheel-wash stations are operational at every site exit. A stormwater pollution prevention plan (SWPPP) is filed with TCEQ before construction starts. The concept plan shows culvert upgrades along FM 2377 sized to handle a 100-year storm event. If a storm event causes mud tracking onto a public road, we clean it up immediately at our cost. 

What noise levels should neighbors expect during active construction phases? Will there be limits on outdoor lighting during construction, and will any visual screening be provided to residences during the construction period? 

Construction noise for a data center is the same as any commercial development. All construction is limited to 7 AM–7 PM per city ordinance, eliminating nighttime noise exposure. 

Border Property Protection & Direct Residential Mitigation

What specific, tangible benefits will be provided directly to the Extra-Territorial Jurisdiction (ETJ) and County residents who border the campus footprint and bear 100% of the disruptions? 

Compass has invested more than $100 million in the Red Oak community since 2019, including $15 million for a new Ellis County animal shelter, a $12.6 million building donated to Texas State Technical College for workforce development, $5 million to Red Oak ISD, Brushy Creek cleanup and floodplain improvements and $72 million in grid infrastructure that serves the entire community, not just the campus.  

The 100-acre public park along Brushy Creek – with hike and bike trails – will be accessible to all residents, including those who live outside the city limits.  

We have maintained an open dialogue with city leadership throughout our six years here, and we are committed to continuing that as this campus develops.  

Will Compass fund direct residential upgrades for immediate neighbors, such as noise-deadening acoustic window retrofits, home insulation upgrades, or advanced HVAC air-filtration systems? 

Our design and operating standards are built to prevent impact on neighboring properties. Compass will comply with all standards set forth in PD-194. We have operated in partnership with the City of Red Oak for six years, and the city is the appropriate authority if those standards are not being met.  

Will Compass explicitly commit to appointing a dedicated, named local liaison with corporate authority to immediately halt problematic site work or address urgent operational grievances, and will neighbors be provided with a direct, 24/7 contact number? 

Compass will comply with all standards set forth in PD-194, just as we have operated in partnership with the City of Red Oak for the past six years. The city is the enforcing authority for this ordinance and our project.

Power Requirements

How much energy does Compass expect to require for each data center building, and is that for the initial data centers or for all buildings at full buildout? 

The Compass prototype calls for 60MW per building, or a maximum of 600MW for the full campus after buildout. However, our customers typically draw closer to 50-70% of this amount. 

What power infrastructure will this campus require? Will it need a new substation? What service voltage is required, and how will the transmission lines and substation affect nearby residential properties? 

The campus will include a new on-site substation. Compass will fund and build the substation and infrastructure upgrades needed for power at its own cost, so those costs are not passed to residential ratepayers. Other questions will be determined by PUC/ERCOT and Oncor. 

All transmission lines will be provided per regulations. 

How many backup generators will each building have, and what type of generator – diesel, natural gas, or HVO biofuel – and what are their noise and emissions ratings? 

Each data center building is equipped with emergency backup generators that run on cleaner burning HVO biofuel, where available, rather than conventional diesel. The benefits of HVO biofuel include: 

  • Lower Greenhouse Gas Emissions: HVO can reduce lifecycle greenhouse gas (GHG) emissions by up to 90% compared to traditional diesel, depending on the feedstock and transport distance. 
  • Improved Air Quality: Burning HVO significantly cuts tailpipe emissions of particulate matter (PM), nitrogen oxides (NOx), carbon monoxide (CO), and sulfur (it is virtually sulfur-free). 

During normal operations, noise is managed at or below the EPA and World Health Organization’s 55 dBA residential guideline.

Cooling Technology

At the May 2026 city council meeting, we were told that data centers on this site would use a closed-loop water cooling system with water trucked in and out. Is that still the plan? 

Compass has never used evaporative cooling, and it is explicitly prohibited under the PD zoning standards. 

Our cooling system is closed loop, filled once and recirculated for the life of the building. During commissioning, Compass fills the loop with available reclaimed water that is trucked in from industrial sources. Using available reclaimed industrial water for flush and fill is standard on every new Compass build. 

What exact technology will capture heat from the servers, and what technology will reject that heat? What is the impact on water use, energy use, and noise? 

Heat is captured from servers and rejected to outdoor air using the VertivTM CoolPhase Flex – a system co-developed with Compass that integrates liquid and air-based cooling in a single unit. Here is more information: Vertiv™ CoolPhase Flex, Hybrid Outdoor Packaged System, DH400, R454B  

The Existing Red Oak Campus (N. Austin Blvd.)

How many buildings at the N. Austin Blvd. campus are currently fully operational, and what do the permanent noise monitors actually show for dBA and dBZ levels at the nearest property line to residents? 

Five buildings are currently operational at the Red Oak – N. Austin Blvd. campus. During normal operations, sound is managed at or below 55 dBA at the property line, the EPA and World Health Organization’s residential guideline.

How much water does each operational data center building at the N. Austin Blvd. campus use per day or per month from any source? 

Compass has used zero municipal water for cooling since we were founded in 2011. Our cooling system is an advanced, closed-loop hybrid system that consumes no water to cool IT equipment. The closed loop is filled once and recirculated for the life of the building.  

Day-to-day water use for humidification, restrooms, break areas, janitorial and cleaning, is modest. Annual consumption per building is roughly equivalent to two average households. 

How often are generators tested at the N. Austin Blvd. campus, how many are tested at once, how long do they run, and when are they tested? 

Engines are heavily regulated by the TDEQ and EPA. Emergency backup generators are tested individually on a staggered monthly schedule, with each test running about 10–15 minutes.

We heard that a neighbor once complained about noise from a Compass data center, Compass sent an expert to investigate, and the problem was resolved. Is that true? What happened, and was the fix applied to other campuses? 

Compass is committed to being a good neighbor. That means managing noise to meet or fall below EPA, World Health Organization and local ordinances. When one resident near our Northern Virginia campus was bothered by a specific frequency in our fans that only she could hear, we fixed it. Then we recalibrated every unit across all our campuses. Go here for more information.

Good Neighbor & Transparency

Is Compass willing to be transparent about development plan changes that might affect us, and will residents have a chance to provide feedback on unexpected changes? 

Any fundamental change to this project would require a permit modification, which would be a public application and process. It is not possible for Compass to unilaterally make a change to our development.

Will Compass offer resident representatives tours of an existing DFW area campus so neighbors can see, hear, and experience the actual presence of a Compass data center firsthand? 

Our campuses are operated under strict security requirements set by our customers, so tours require their approval and are not something we can offer independently. That said, we are willing to inquire on behalf of a small group of interested residents. If approved, anyone participating would need to sign standard non-disclosure and security documents required by our customer prior to entry. 

Will Compass notify residents in advance of generator tests, design changes, or other disruptions, and will it post updates on social media and its website? 

Compass is committed to being a good neighbor, as we have demonstrated through six years of partnership with the City of Red Oak. We do not anticipate disruptions to neighboring properties during normal operations. Emergency backup generator tests are scheduled during weekday business hours and will be infrequent. Any modifications to the approved development would go through the city’s public permitting process, which provides public notice by design. 

Didn’t find the answer? Ask us about our services!

Frequently Asked Questions

About Compass

What makes Compass different from other developers? 

As a Class A, Community-First developer, we own and operate every campus we build. And we published a checklist any community can use to hold developers to a high standard, including us. Investing in communities we call home is a core tenant of that standard 

Who is your customer, and what will go into the building? 

Our customers are cloud and hyperscale providers — companies whose names people would recognize. The building holds servers and other equipment that support business critical computing that people use every day. Things like online banking and electronic payments, hospital and medical records, insurance claims, shipping and logistics and email, photo sharing and streaming. 

If you build it, will you stay? 

That is the right question to ask any developer. We own and operate every campus we build rather than selling them. The buildings are designed so equipment can be replaced as technology changes, without rebuilding. 

We have the same interest this community does in this region’s grid, roads and water still being sound decades from now. 

Water Stewardship

How much water do you use?

Since our founding in 2011, Compass has never used municipal water for cooling. Our cooling system is a closed loop, filled once and recirculated for the life of the building. Day to day, each building uses about as much water as two average households for restrooms and break rooms.  

What’s different about how you fill the cooling system?

Most closed-loop cooling systems are flushed and filled with city drinking water. Compass fills the loop with reclaimed water from industrial sources instead of using city water. Using reclaimed industrial water for flush and fill during commissioning is standard on every new Compass build. 

What do you treat the water with?

Standard additives that prevent corrosion and bacteria, the same kinds used in commercial heating and cooling systems, not anything unique to data centers. Our supplier, Ecolab, confirms PFAS (“forever chemicals”) are not used in these products. The treated water stays sealed inside our cooling pipes, separate from the drinking water supply.  

What is the cooling liquid made of?

It is 25% glycol and 75% water, delivered pre-mixed — the same family of coolant used in car radiators and home air conditioning. None of it contains PFAS, or ‘forever chemicals.’ It recirculates in a fully closed loop rather than evaporating, and it is never released into the environment. 

Do you ever change out the water in the loop?

Not during normal operation. Nalco, an Ecolab company, tests the water routinely and adjusts the treatment, so it can keep recirculating. The water may be replaced when the data hall’s equipment reaches the end of its useful life, typically around 20 years. When it is, a licensed handler collects it for recycling.

What happens if there is a leak in the building? Have you ever had a leak in a building?

The cooling loop is sealed and sits inside the building, not in the ground. It is monitored continuously, so a drop in pressure shows up immediately and the system flags it so it can be addressed. We have only had small leaks during system commissioning, all contained and disposed of appropriately. 

 

How much water is used during construction?

Water used during construction is typical of projects this size, and it is used for concrete mixing, dust control and site prep, drawn through standard permits like any other contractor. Where we can, we are shifting dust control and site prep to reclaimed industrial water. Domestic water use during operations drops to about two households per building – none of it for cooling. 

Electricity and Rates

Will the data center raise my electricity bill?

Compass  pays for the infrastructure our campus needs for power, or we pay a higher dedicated rate charged only to us. Either way, those costs are not added to residential bills. Twenty-five utilities across nineteen states have adopted this approach. We cannot promise a utility will never raise rates – fuel prices, severe storms and unrelated capital projects all drive rates. What we can say is that our load will not be the reason.  

What about backup generators? Will we smell or hear them?

Generators are there for one reason: to keep the site running if utility power fails. They are not a power source, and they do not run to supply the campus. Our generators use cleaner-burning biofuel rather than traditional diesel. They are tested periodically, during daytime hours, and both the emissions and the sound are included in the air quality analysis and the acoustic modeling we do to ensure our project complies  with all EPA and local guidelines. 

What happens if our community experiences a grid emergency?

Compass’ power approach is community-first and grid-positive. In a declared grid emergency, under an electric service agreement with the local utility, large loads like ours are the first to be disconnected from the grid. The utility makes those calls.

At times when the grid is stressed, such as a 100-degree afternoon or a cold winter morning, if the utility asks, Compass will voluntarily disconnect from the grid to run on backup generation, so homes and businesses stay powered first.  

Does EMF from power lines, substations or data center equipment cause health problems?

No. The World Health Organization reviewed tens of thousands of studies and found no evidence that low-level EMF from power lines, substations or electrical equipment harms human health. It is the same kind that has flowed safely through household wiring and neighborhood power grids for more than a century. 

The Site and Neighbors

How much traffic will this bring?

Construction is the heavier phase, and it is temporary. Because more than 80% of our buildings are prefabricated off site and concrete is also mixed on site where possible, we generate substantially fewer truck trips than a conventional build of this size. That’s part of our Class A standard. Once operating, a campus like this produces very little traffic — a few hundred people across shifts, unlike a shift change at a factory. 

How much noise will the data center create?

We are committed to being a good neighbor. Compass designs and operates every campus to manage noise at or below the what local ordinances require. 

What happens in an emergency?

The campus runs around the clock and is monitored 24/7. Safety is a top priority, and we work continuously to identify and mitigate risk before it becomes a problem. Our emergency response plan is coordinated with local officials. Due to the size of the client’s technology investment inside our buildings, we utilize the most advanced fire prevention and detection systems in the world. 

Does Compass use NDAs to shield home communities from information? 

No. 